


13. s main street façade
This project involves the addition of a balcony to an existing 2nd level downtown residence and the redesign of both the interior residence and restaurant below.
Project Team:
Contractor: Sexton
Landscape Architect: Sexton
Structural: HG&A
Year: 2022 - Ongoing
This project involves the addition of a balcony to an existing 2nd level downtown residence and the redesign of both the interior residence and restaurant below.
Project Team:
Contractor: Sexton
Landscape Architect: Sexton
Structural: HG&A
Year: 2022 - Ongoing
greenville sc

